Quality Control – DMLT MCQ Questions and Study Notes

Quality control ensures laboratory results are accurate and dependable. Practice free DMLT MCQ questions on this topic below.

Take the Quality Control practice test All 8 chapters

Learning objectives

Study notes

Internal quality control runs known control samples daily. Results are plotted and reviewed, and corrective action is taken if controls fail.

Pre-analytical errors (wrong sample, labeling, transport) cause most lab errors, so careful sample handling matters.

Important points

Key terms

Control Accuracy Precision Pre-analytical

Practice MCQs on Quality Control

Tap “Show answer” to check each answer and read the explanation. These practice questions are written for learning with AI assistance and may contain mistakes. Please report any error so it can be fixed.

Questions 1 to 10

1. Accuracy means results are:

  1. Fast
  2. Close to true value
  3. Cheap
  4. Random
Show answer
Answer: B. Close to true value
Correctness.

Report an error in this question

2. Precision means results are:

  1. Reproducible
  2. Fast
  3. Random
  4. Cheap
Show answer
Answer: A. Reproducible
Consistency.

Report an error in this question

3. Most lab errors occur:

  1. Never
  2. In storage
  3. Pre-analytically
  4. Only in reporting
Show answer
Answer: C. Pre-analytically
Sample handling.

Report an error in this question

4. If QC fails you should:

  1. Ignore
  2. Stop and investigate
  3. Hide
  4. Report anyway
Show answer
Answer: B. Stop and investigate
Patient safety.

Report an error in this question

5. Controls are run:

  1. Never
  2. Rarely
  3. Yearly
  4. Every day of testing
Show answer
Answer: D. Every day of testing
Routine.

Report an error in this question

6. Corrective actions must be:

  1. Documented
  2. Skipped
  3. Hidden
  4. Forgotten
Show answer
Answer: A. Documented
Traceability.

Report an error in this question

7. Internal quality control uses:

  1. Old reports
  2. Random patient samples
  3. Distilled water only
  4. Control samples with known values
Show answer
Answer: D. Control samples with known values
Run every day.

Report an error in this question

8. External quality assessment is also called:

  1. Inventory checking
  2. Staff rotation
  3. Daily calibration
  4. Proficiency testing
Show answer
Answer: D. Proficiency testing
Compares labs.

Report an error in this question

9. A Levey-Jennings chart plots control values over time against:

  1. The patient names
  2. The staff names
  3. The mean and standard deviation limits
  4. The price
Show answer
Answer: C. The mean and standard deviation limits
Shows shifts and trends.

Report an error in this question

10. Under the Westgard 1-3s rule a control more than 3 SD from the mean means:

  1. Nothing to do
  2. Test a new patient
  3. The run is rejected
  4. The run is accepted
Show answer
Answer: C. The run is rejected
Random error.

Report an error in this question

Questions 11 to 20

11. Calibration differs from QC because calibration:

  1. Cleans the machine
  2. Is optional
  3. Checks performance only
  4. Sets the instrument response
Show answer
Answer: D. Sets the instrument response
Use known standards.

Report an error in this question

12. Standard deviation is a measure of:

  1. The price
  2. The mean
  3. Spread of the results
  4. The highest value
Show answer
Answer: C. Spread of the results
Smaller is more precise.

Report an error in this question

13. A reference interval is often the mean plus or minus:

  1. 10 standard deviations
  2. 1 week
  3. 2 standard deviations in healthy people
  4. The median only
Show answer
Answer: C. 2 standard deviations in healthy people
Covers about 95 percent.

Report an error in this question

14. A delta check compares a result with the patient's:

  1. Neighbor's result
  2. Name
  3. Previous result
  4. Age
Show answer
Answer: C. Previous result
Detects sample mix-ups.

Report an error in this question

15. Samples may be rejected if they are:

  1. Properly labeled
  2. Hemolyzed, clotted or unlabeled
  3. Fresh
  4. Clean
Show answer
Answer: B. Hemolyzed, clotted or unlabeled
Rejection criteria.

Report an error in this question

16. Reports are verified:

  1. Before release
  2. Never
  3. After release
  4. Only on request
Show answer
Answer: A. Before release
Prevents errors.

Report an error in this question

17. A critical value requires:

  1. Ignoring
  2. Immediate notification of the clinician
  3. Waiting for the next day
  4. Sending by post
Show answer
Answer: B. Immediate notification of the clinician
Patient safety.

Report an error in this question

18. SOPs are:

  1. A holiday list
  2. A price list
  3. Written step-by-step procedures
  4. A staff list
Show answer
Answer: C. Written step-by-step procedures
Keep them current.

Report an error in this question

19. Traceability of calibrators means:

  1. Painting labels
  2. Skipping labels
  3. Linking them to a reference standard
  4. Making them cheaper
Show answer
Answer: C. Linking them to a reference standard
Supports accuracy.

Report an error in this question

20. Preventive maintenance of equipment is done:

  1. By guess
  2. Never
  3. Only when it breaks
  4. On a planned schedule
Show answer
Answer: D. On a planned schedule
Reduces breakdowns.

Report an error in this question

Related chapters

Continue learning

DMLT interview questions Mock tests MCQ practice

Frequently asked questions

How many Quality Control MCQs are available?

This page has 20 free MCQs on Quality Control with answers and explanations. More are added over time.

Is Quality Control practice free?

Yes. You can practice without login or payment.

Are these official DMLT exam questions?

No. They are original practice questions written for learning.